Tools & Materials:
- Power saw, hammer, chalk line and tool listed below - Staple Gun: Stanley Mark 3 - Staples: 1 1/2” Staples For 1/2” for MIFS or 1-1/2” Power cleats for Model 445 Sub floor & Preparation: Sub floors should be flat to 3/16” per 8’ radius. If sub floor prep work is required, “highs” should be ground down and the “lows” filled with an underlayment patch. Acceptable sub floors are the following: Acceptable sub floors are the following:
5 Comments
Daria
1/24/2011 05:50:37 am
How long should the flooring be allowed to acclimate to the house before installation?
Reply
Reza M
3/9/2013 09:50:45 am
Freshly milled flooring usually has moisture content between 6% - 9%, and requires 3 days in the area of installation to acclimate.
Reply
Andy Myhr
1/24/2011 06:00:18 am
Freshly milled flooring usually has a moisture content between 6% - 9%, and requires 3 days in the area of installation to acclimate.
Reply
5/30/2012 07:33:59 am
Hey There. I discovered your weblog the use of msn. This is a very smartly written article. I will be sure to bookmark it and come back to read extra of your useful info. Thanks for the post. I will definitely comeback.
Reply
Sushil Baja
3/9/2013 09:48:26 am
Both methods will work, as long as it's within the manufacturer's recommendations. Nail down at least offers a chance to reuse/reposition the boards later ... glue-down, it's one time and one-time only.If the manufacturer allows for floating (some engineered woods can), consider that instead glue-down. That way, you can use a moisture resistant underlayment - something you can't with a glue-down.
Reply